HydroChem has been providing expert cooling tower services and solutions since 1977. Our team is one of Australia’s most trusted pair of hands for commercial and industrial cooling tower repairs, maintenance and installation.

We specialise in:

  • Basin resealing
  • Safe access platform installation
  • Drift eliminator replacement, installation and spare parts
  • Air intake louvre replacement, installation and spare parts
  • Counterflow/crossflow fill pack replacement, installation and spare parts

This case study profiles the overhaul of a Victorian era, mixed use building’s cooling tower and HVAC system performed by the HydroChem team. The installation of a new dosing and monitoring system and replacement of the cooling tower’s fill pack delivered impressive savings.

Buildings and Facilities

Buildings and Facilities

Chemical Processing

Chemical Processing

Construction

Construction

Food and Beverage

Food and Beverage

Health and Aged Care

Health and Aged Care

Manufacturing

Manufacturing

Mining

Mining

Pharmaceuticals

Pharmaceuticals

Power and Petrochemical

Power and Petrochemical

Steel, Metal and Plastics

Steel, Metal and Plastics