The Goldsbrough Building is one of Sydney’s most historic buildings, a true Victorian original. When originally designed it incorporated state-of-the-art technology that was ahead of its time. The iconic building was again a sustainability leader when converted to apartments in the mid-1990’s.

This case study profiles a recent overhaul of the building’s cooling tower and HVAC system that was in part delivered by our HydroChem NSW team who help to manage the water in the building. A new dosing and monitoring system and tower fill pack has delivered impressive savings.

 

Click image below to download the full case study.